Core path
Internet/WAN -> modem/ONT -> gateway/router/firewall -> PoE switch.
Task 8 Project Guide
Translate the floorplan design into a logical network topology.
Core path
Internet/WAN -> modem/ONT -> gateway/router/firewall -> PoE switch.
Wired branch
PoE switch -> APs, cameras, home office dock and media devices.
Wireless branch
APs -> family, guest and IoT wireless devices.
Floorplan only
No switch
Clients directly on WAN
No labels